97久久久-97久久久-97久久久-97久久精品人人澡人人爽-欧美黄色片在线观看-欧美黄色片在线观看

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
News
Hot products

Service Hotline

0755-29727486 0755-83734215 0755-83734236
FAQ

Where are you now:Home >> News >> FAQ
What exceptions will occur during SMT production? Normally
Time:2021-10-08 Read: 2529

1. Ideal solder joints

It has good surface wettability, that is, the molten solder should spread on the surface of the welded metal and form a complete, uniform and continuous solder covering layer, and its contact angle should not be greater than 90


The correct amount of solder, the amount of solder is sufficient but not too much or too little

For a good welding surface, the surface of the solder joint should be complete, continuous and smooth, but it does not require a very bright appearance.

Good solder joint position The position deviation of the solder end or pin of the component on the pad is within the specified range.


2. No wetting

The contact angle formed by the solder on the solder joint and the surface of the welded metal is greater than 90


3. Open welding

The pad is separated from the PCB surface after soldering.


4. Suspension bridge (drawbridging)

One end of the component leaves the pad and faces the bag upright diagonally or upright


5. Bridging

The solder between two or more solder joints that should not be connected is connected, or the solder joints of the solder joints are connected with adjacent wires.


6. Welding

After soldering, electrical isolation sometimes occurs between the solder end or the pin and the pad


7. Draw the tip

There are solder burrs protruding outward in the solder joints, but they are not in contact with other conductors or solder joints


8. Solder ball

A small ball of solder that adheres to the printed board, the solder mask or the conductor during soldering.


9. Holes

Holes with different apertures appear in the weld


10. Position offset (skewing)

When the solder joint deviates from the predetermined position in the horizontal, vertical or rotational direction in the plane.


11. Visual inspection

With the aid of a magnifying glass of 2~5 times of the illumination, inspect the quality of PCBA solder joints with naked eyes


12. Inspection after aoldering

Quality inspection after PCB is soldered.


13. Reworking

Repair process to eliminate local defects of surface mount components.


14. Placement inspection

When surface mount components are mounted or after they are mounted, quality inspection is carried out for any missing, misplaced, mis-mounted, damaged, etc. conditions.


In SMT inspection, two methods, visual inspection and optical equipment inspection, are often used. Some only use the visual inspection method, and there are also two mixed methods. They can all inspect the product, but if the visual inspection method is used, people will always get tired, so there is no guarantee that employees will conduct a careful inspection. Therefore, we need to establish a balanced inspection and monitoring (monitering) strategy that is to establish quality process control points.


In order to ensure the normal operation of SMT equipment, strengthen the quality inspection of the processed workpieces in each process, so as to monitor its operating status, and establish quality control points after some key processes. These control points are usually established in the following locations:


1) PCB inspection

a. Whether the printed board is deformed; b. Whether the pad is oxidized; c. Whether the surface of the printed board is scratched;

Inspection method: visual inspection according to inspection standards.


2) Silk screen inspection

a. Is the printing complete; b. Is there any bridging; c. Is the thickness uniform; d. Is there any sag; e. Is there any deviation in the printing;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


3) Patch inspection

a. The placement position of the component; b. Whether there is a chip; c. whether there is a wrong part;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


4) Reflow soldering inspection

a. The soldering condition of the component, whether there are bad soldering phenomena such as bridging, tombstones, dislocation, solder balls, virtual soldering, etc. b. Soldering joints.

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.tax-c.com.cn

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
主站蜘蛛池模板: 久久国内视频 | 欧美性生活一级 | 国产精品网址你懂的 | 五月天天色 | 天天操天天干天天操 | 五月激情丁香网 | 日韩在线视频免费观看 | 亚洲国产片| 天天干夜夜爽 | 一卡二卡三卡四卡无卡在线 | 天堂8在线天堂资源在线 | 国产乱淫a∨片免费视频 | 三级网站在线播放 | 午夜小视频网站 | 国产成人综合一区人人 | 亚洲成人免费 | 婷婷丁香色综合狠狠色 | 福利你懂的 | 中文字幕在线观看一区二区三区 | 男女无遮挡在线完整视频 | 啪啪在线视频 | 久久久噜噜噜久久久午夜 | 中文字幕在线二区 | 男人j进入女人j视频大全 | 男人的视频网站 | 久久精品夜色国产 | 亚洲一区二区综合 | 欧美大片xxxxbbbb | 手机看片日韩在线 | 中文字幕在线看精品乱码 | 波多野结衣一级特黄毛片 | 在线天堂视频 | 亚洲综合啪啪 | 成人在线91 | 国语自产免费精品视频一区二区 | 欧美大胆一级视频 | 加勒比色综合 | 欧美成人性高清观看 | 羞羞答答xxdd影院欧美 | 老司机51精品视频在线观看 | 男人的天堂97 |